Call Today: (281) 455-4999
Discover how PowerCon gets you covered and keeps you working.
We'll get in and fix your roof with no down-time for your opperation

POWERCON Keeps You Working

How long do metal roof repairs take to complete?

It takes far less time to install a metal roof than any other type. That's because the panels cover a large area than conventional asphalt shingles.

Much will depend on the extent of the building's damage, but we'll give you a firm timeline for all your repairs, so you know exactly what to expect.

  • 1

    We Get In and Out, No Down-Time for Your Operation

  • 2

    Fast Turn Around Time, We Can Get Started Immediately

  • 3

    We are Fully Insured for Your Protection

Need Metal Building Roof Repair

Don't Get Displaced


POWERCON is in and out fast-no loss of quality.

EXPERIENCE

30+ years

Having an experienced contractor on your side saves time and money, as we can more accurately identify problems and fix them timely. We have maintained an A+ rating with the BBB since 2003, receiving zero complaints.

SAFETY

Protecting people

Because of our extensive experience and being focused on the safety of our employees we are able to get in and get out. This affords us the opportunity to keep you working and allows us to remain accident free.

CERTIFICATION

Doing it right

Unlike other repair companies, PowerCon insures each member of the team is cetified to operate every piece of equipment required to get the job done. Otherwise they'll be cutting corners and taking chances.

//powercon.us/wp-content/uploads/2018/05/about_us_img.png
PowerCon Construction Services prides ourselves on workmanship, safety, and the ability to complete jobs other companies say are impossible.

Our highly skilled supervisors and in-house engineer have the training, experience and know-how to tackle any assignment, while allowing your business to continue day-to-day operations in most cases.

Tom Taylor
PRESIDENT, OWNER
//powercon.us/wp-content/uploads/2018/05/john_sign_img.png
We’re always interested in new projects, big or small. Please don’t hesitate to get in touch with us regarding your project.

If you want to contact us about any issue please call (281) 455-4999 or send us an email. If you would like to submit a proposal for consideration simply get a quote.

//powercon.us/wp-content/uploads/2018/05/metal-uilding-repairs.jpeg

Metal Building
Repairs

Build-out of custom powder coating bay: Custom building/business expansion. Design and fabricate custom staging, sand-blasting and furnace addition to existing building.

Time Onsite: Expected job duration - 6 weeks, actual completion, 4 weeks under budget.

Safety Record:

Customer Satisfaction:

//powercon.us/wp-content/uploads/2018/05/facility-maintenance.jpeg

Facility
Maintenance

Installation of OSHA safety equipment:Design and installation of OSHA mandated safety items including safety guards and rails, screens, walkways, bollards and others. 100 acre, 15 building complex.

Time Onsite: Expected job duration - 36 months, actual completion, 20 months, under budget

Safety Record:

Customer Satisfaction:

//powercon.us/wp-content/uploads/2018/05/metal-roof-repairs.jpeg

Metal Roof
Repairs

Renovation and repair of over 1 million sq ft of buildings: Design, fabricate and installation of complete roof system with enhanced drainage systems above and below ground. One of the largest manufacturing building complexes in the country.

Time Onsite: Expected job duration - 18 months, actual completion, 10 months, under budget.

Safety Record:

Customer Satisfaction:

Testimonials

Contact Info

have a question, call now (281) 455-4999